Founder’s Project Experience

These photos are from projects William Huang worked on before founding ALTOS H BUILDERS. His experience spans home additions, new home construction, and commercial real estate development projects in San Francisco and elsewhere in the Bay Area.

Before Construction

Existing conditions before work began.

Original single-story ranch house before work began.

Foundation and Crawl Space

Footing forms with rebar, and plumbing lines in the crawl space.

Footing forms with rebar, ready for concrete.
New footing forms in front of the existing floor deck, where new walls are being framed.
Close view of a footing trench with rebar and wood forms.
Crawl space under the house, with new copper and drain lines running between the floor posts.
New copper water lines and drain pipes in the crawl space.

Framing

Wall framing, roof rafters, and skylight openings.

Roof framing with three skylight openings, seen from inside.
Framed hallway with exposed ceiling joists over the original plank floor.
House exterior during framing, with the walls sheathed and a gabled bay at the front.
Wall framing going up across the site under a clear sky.
Roof rafters and wall framing, still open to the sky.
Interior walls framed on the original plank floor, with new sliding doors along the back.

Insulation and Drywall

Insulation, weather barrier, and drywall.

House exterior with new windows installed and weather barrier on the walls.
Gable wall framing with insulation behind it, before drywall.
Drywall on a vaulted ceiling with three skylights, with a rolling scaffold below.
Great room after drywall, with scaffolding and the windows covered.
Drywalled hallway leading toward the front entry.
Small room with drywall on the walls and the ceiling framing still open.

Cabinetry and Flooring

Kitchen island, built-in shelving, a bathroom vanity, and hardwood flooring.

Kitchen island with wood cabinets and a waterfall stone countertop, with the floor still protected.
Kitchen island cabinets being installed, with a plywood top in place.
Bathroom double vanity with wood cabinets and a white stone top.
Built-in wood shelving and lower cabinets beside a sliding glass door.
Wide-plank wood flooring being laid in the main living area.
New wood flooring in the great room, looking toward the sliding doors.

Completed Home

The finished kitchen, great room, and front entry.

Finished great room and kitchen with a large island and pendant lights, a project William Huang worked on.
Finished kitchen with a waterfall island, bar stools and wood cabinets.
Finished front entry with a wood door, stone columns and black-framed windows, a project William Huang worked on.
Nearly finished house with a standing-seam metal roof, as the landscaping goes in.

Bathrooms

Finished bathrooms: tile, vanities, a freestanding tub, and a glass-enclosed shower.

Freestanding tub beside a glass-enclosed shower, in a home William Huang worked on.
Glass-enclosed shower with marble-look tile, a long niche, and a herringbone floor.
Bathroom with a geometric tile wall, an oval mirror, and a wood vanity.
Bathroom with a freestanding tub, white vanities with marble tops, and framed mirrors.
Marble-tiled walk-in shower looking out toward the vanity.
Bathroom with a tub and tiled surround, a toilet, and a white vanity with a marble top.
Bathroom with a white vanity, a framed mirror, and a tub with a tiled surround.

Commercial Interior

Metal stud framing and a mezzanine in a commercial interior.

Commercial interior with a glass-railed mezzanine and linear lights under a black ceiling, a project William Huang worked on.
Metal stud partition framing in a commercial space.
Mezzanine and scissor lift in a commercial interior during construction.
Drywalled corridor in a commercial space with an exposed black ceiling.
Commercial corridor with drywall partitions and door openings.
Open commercial floor with new drywall partitions beside the mezzanine railing.

Commercial Exterior

Steel deck, rebar, and the concrete slab at roof level of a commercial building.

Crew placing rebar on a steel floor deck at roof level of a commercial building, a project William Huang worked on.
Steel deck with rebar and shear studs in place before the concrete pour.
Steel deck and rebar along the edge of the roof level.
Steel deck meeting a standing-seam metal roof.
Roof-level concrete slab after the pour, with rooftop mechanical units.

Completed Commercial Building

Finished exteriors, walkways, and planters at a completed commercial development.

Completed building with stucco and wood-look siding, balconies, and a paved courtyard, a project William Huang worked on.
Concrete ramp and walkway between the completed buildings.
Street corner of the building with wood-look cladding and storefront glazing.

ADU Under Construction

Foundation, floor framing, wall and roof sheathing, windows, and roof underlayment on an ADU.

Footing trenches with form boards and rebar, and pier holes dug across the ADU pad.
Foundation forms set around the ADU footprint, with boxed pier footings inside.
Foundation forms and pier footing boxes beside the driveway before the concrete pour.
Concrete being pumped into the foundation forms.
Foundation walls after the forms came off, with sill plates going on.
Floor joists framed over the foundation, seen from the corner.
Floor framing across the full length of the ADU.
Crew installing under-floor plumbing between the floor joists.
ADU with walls sheathed and roof framing in place.
ADU with wall and roof sheathing complete, before windows.
Windows installed and roofers working on the sheathed roof.
Roof underlayment going on, with windows installed below.